FIRENZE VALET TRAY SQUARE

305 €   tax incl.

Production time approximately 12 weeks.

Leather covered wood structure. Metal base frame available in three finishes. Non-slip waterproof rubber base underneath.

Add to wishlist

    30 other products in the same category: